# YPMS — TODO Checklist **Owner:** DOES CIO **Last touched:** 2026-09-30 **Scope:** everything from team formation through Go-Live and steady-state operations. Companion tracker: [`POAM.md`](POAM.md) holds the numbered, dated, milestone-tracked version of the ATO items below. Legend: `[ ]` open · `[~]` in progress · `[x]` done · `[!]` blocked · `[?]` needs decision --- ## 0. Team formation and governance - [x] ISSO assigned in writing for YPMS (Chris Tonjes; `YPMS-POAM-090` closed 2026-09-30) - [x] AO designated in writing (Chris Tonjes; `YPMS-POAM-002` closed 2026-09-30; role-concentration acceptance in SSP §5) - [ ] Business Owner named (OYP) - [ ] DOES OIT delivery lead named - [ ] Backend engineer(s) assigned - [ ] Frontend engineer(s) assigned - [ ] Data/integration engineer assigned (owns OSSE, CFSA, SSA, DC MAR, payroll) - [ ] Test/QA lead assigned - [ ] DC OCTO cloud coordination POC identified ## 1. Stack and architecture decisions - [x] **Stack decision** — Python 3.12 / FastAPI / SQLAlchemy / Postgres (OWC alignment; recorded 2026-09-30) - [x] Azure Government confirmed as hosting (aligned with OWC and Employer 360) - [?] **Level 3 security clarification** — source RFP `C.5.7.24` (`YPMS-POAM-051`) - [?] **Youth identity model** — social-media login scope, IAL2-equivalent proofing before payroll actions, parental co-auth for under-18 (`YPMS-POAM-050`) - [?] **PCI DSS applicability** — expected out of scope since payroll is ACH via vendor (`YPMS-POAM-052`) - [?] **Health-record CSV path disposition** — in-boundary vs. emergency extension (`YPMS-POAM-053`) - [?] **Retention policy** — audit logs, case records, backups (`YPMS-POAM-054`) - [ ] SORN applicability determination (`YPMS-POAM-094`) - [ ] Correct the youth-age typo from the source RFP (glossary says "99–24"; should be 14–24) in derived requirements - [x] High-level architecture document v0.1 drafted (`ypms/ARCHITECTURE.md`, 2026-09-30) - [x] Conceptual data model in `ARCHITECTURE.md` §6 (25 core entities enumerated); logical + physical ERDs remain - [ ] Logical and physical ERDs, full data dictionary, CRUD matrix (extends `ARCHITECTURE.md` §6) - [ ] Security architecture review with DC OCTO (referenced in `ARCHITECTURE.md` §8) ## 2. Environments and pipeline - [ ] Azure Government subscription requested and provisioned (`YPMS-POAM-041`) - [ ] Dev environment - [ ] Test environment - [ ] Production environment (later) - [ ] CIS Azure Foundations baseline applied to all environments - [ ] Azure Key Vault (FIPS 140-3 HSM) provisioned (`YPMS-POAM-032`) - [ ] Managed Identity model for service-to-service auth - [ ] Postgres flexible server provisioned (private endpoint) - [ ] Git repo initialized under `ypms/` (this directory) with branch protection - [ ] CI/CD pipeline scaffold (`YPMS-POAM-042`) - [ ] Build + unit-test gate - [ ] SAST gate - [ ] SCA (dependency vulnerability) gate - [ ] Secret scanning gate - [ ] SBOM generation per release (CycloneDX) - [ ] Container image scanning - [ ] Sentinel integration for log streaming (`YPMS-POAM-043`) - [ ] Backup + restore procedure documented and tested (`YPMS-POAM-044`) ## 3. Data-sharing agreements & interconnections Existing DOES agreements cover the current OYP workflows; YPMS-scope amendments or renewals are the path, not new drafts. - [ ] **DOES–OSSE data-sharing agreement (FERPA)** — renewal / YPMS-scope amendment (`YPMS-POAM-020`) — **blocks OSSE ingest build** - [ ] **DOES–CFSA MOU (DC Code Title 4)** — renewal / YPMS-scope amendment (`YPMS-POAM-021`) — **blocks CFSA ingest build** - [ ] **SSA Electronic Information Exchange agreement** — renewal / YPMS-scope confirmation (`YPMS-POAM-022`) — **blocks SSN cross-match build** - [ ] **DC MAR service agreement** — confirm coverage under existing OCTO umbrella - [ ] **Payroll vendor selection + security review + ISA/DPA** (`YPMS-POAM-023`) — **blocks payroll integration build** - [ ] **LMS vendor selection + security review** — blocks orientation-tracking build - [ ] **DC OCTO Sentinel MOU / ingestion agreement** - [ ] **NOC coordination arrangement** — 30-day maintenance-window notice cadence - [ ] **Emergency health-record CSV path** — either MOU with source or scoping decision to defer (`YPMS-POAM-053`) - [ ] ISAs / NIST 800-47 Rev. 1 documents for each of the above (`YPMS-POAM-084`) ## 4. ATO artifacts - [x] Draft SSP v0.3 (`ypms/SYSTEM_SECURITY_PLAN.md`) — in-house build reframe complete (`YPMS-POAM-010`) - [x] Draft NIST 800-53 control mapping v0.2 (`ypms/NIST_800_53_CONTROL_MAPPING.md`) — in-house build reframe complete (`YPMS-POAM-015`) - [x] Draft POA&M v0.1 (`ypms/POAM.md`) — reflects in-house build model - [ ] **FIPS 199 categorization memo** signed by AO (`YPMS-POAM-001`) - [x] **Privacy Impact Assessment v0.1 drafted** (`YPMS-POAM-011`; `ypms/PRIVACY_IMPACT_ASSESSMENT.md`; 2026-09-30) — awaiting Privacy Officer + OGC review, then AO signature - [ ] **Incident Response Plan** — tabletop with DC OCTO SOC (`YPMS-POAM-012`) - [ ] **Contingency Plan** — functional restore drill (`YPMS-POAM-013`) - [ ] **Rules of Behavior** — staff / host / youth+parent variants with parental-consent flow (`YPMS-POAM-014`) - [ ] **Continuous Monitoring Strategy** document (`YPMS-POAM-074`) - [ ] **Independent Control Assessment (SCA)** commissioned and executed (`YPMS-POAM-060`) - [ ] **Penetration test** commissioned and executed (`YPMS-POAM-061`) - [ ] **ATO decision package** compiled and submitted to AO - [ ] **ATO signed** before production data flows in ## 5. Build Iterative Agile delivery (Scrum/Kanban/SAFe — match OWC's phased approach). Illustrative phase breakdown; refine at architecture kickoff. - [ ] **Phase 1 — Foundation.** Auth, user model, RBAC, base UI shell, admin skeleton, audit-logging framework. - [ ] **Phase 2 — Application intake.** Youth registration, application form, save/resume, document upload with malware scanning. - [ ] **Phase 3 — Eligibility engine.** Rules-driven auto-eligibility from Appendix D of source RFP; categorical eligibility across programs. - [ ] **Phase 4 — External integrations.** DC MAR address verification, SSA SSN verify (blocked on `YPMS-POAM-022`), OSSE ingest (blocked on `YPMS-POAM-020`), CFSA ingest (blocked on `YPMS-POAM-021`). - [ ] **Phase 5 — Certification and orientation.** Certification event workflow, LMS integration. - [ ] **Phase 6 — Host/employer.** Host registration, worksite management, job posting. - [ ] **Phase 7 — Matching and enrollment.** Job matching engine, program enrollment. - [ ] **Phase 8 — Time and payroll.** Online timekeeping, payroll vendor integration (blocked on `YPMS-POAM-023`), transportation vouchers, tax forms. - [ ] **Phase 9 — Reporting.** Native reports replacing MicroStrategy; audit-log search. - [ ] **Phase 10 — Admin functions.** Broadcast notifications, workflow rule maintenance, user profile management. ## 6. Security implementation (crosscuts all phases) - [ ] MFA for staff and admin (Entra ID conditional access) (`YPMS-POAM-030`) - [ ] TLS 1.2+ enforced everywhere; SSL Labs A+ on public endpoints (`YPMS-POAM-031`) - [ ] FIPS 140-3 cryptography (`YPMS-POAM-032`) - [ ] IAL2-equivalent identity proofing before payroll actions (`YPMS-POAM-033`) - [ ] SSN masking + at-rest encryption (`YPMS-POAM-080`) - [ ] System-use notification banner (`YPMS-POAM-070`) - [ ] Auto-disable inactive accounts (`YPMS-POAM-071`) - [ ] Quarterly privileged-access recert process (`YPMS-POAM-072`) - [ ] Annual all-user access recert process (`YPMS-POAM-073`) - [ ] Language Access Act compliance (`YPMS-POAM-081`) - [ ] Section 508 / WCAG 2.1 AA compliance audit (`YPMS-POAM-082`) - [ ] Parental consent workflow for under-18 (`YPMS-POAM-083`) - [ ] Anti-bot / rate-limit for MBSYEP peak windows (`YPMS-POAM-101`) ## 7. Testing - [ ] Unit-test coverage target set and enforced in CI - [ ] Functional tests per feature - [ ] Non-functional tests: performance (99.5% SLA envelope, <1s response), load (50%/year growth headroom) - [ ] Accessibility tests (Section 508) - [ ] Language-access tests - [ ] UAT plan and test scripts approved - [ ] Vulnerability scanning cadence in production (`YPMS-POAM-062`) ## 8. Legacy retirement & data migration - [ ] Data-migration plan from each of the seven legacy tools (`YPMS-POAM-105`) - [ ] Data-quality baselines documented per source - [ ] PII handling during migration - [ ] Cutover strategy — big-bang vs. phased-by-program - [ ] Read-only archive of legacy data for audit / statute-of-limitations retention - [ ] Legacy system decommission schedule and destruction evidence (`YPMS-POAM-106`) ## 9. Training & change management - [ ] Training plan for OYP staff, host/employer, youth self-service (`YPMS-POAM-091`) - [ ] System overview intro video (MP4, closed captioned) - [ ] Role-based training materials - [ ] Help / KB content with an updateable help system ## 10. Go-Live & steady-state - [ ] Go/No-Go decision meeting with AO - [ ] Cutover runbook rehearsed - [ ] Go-Live - [ ] Post-Go-Live retrospective ## 11. Continuous monitoring (steady-state cadence) - [ ] Monthly vulnerability scans - [ ] Monthly POA&M review by DOES ISSO - [ ] Quarterly privileged access recertification - [ ] Annual full access recertification - [ ] Annual Contingency Plan test (tabletop + functional element) - [ ] Annual Independent Control Assessment - [ ] Annual penetration test - [ ] Annual SSP refresh - [ ] Monthly availability performance report against 99.5% SLA --- ## Immediate next actions (this week) 1. ~~SSP v0.3 in in-house build framing~~ ✓ 2. ~~Control mapping v0.2 in in-house build framing~~ ✓ 3. ~~POA&M v0.1 seeded~~ ✓ 4. ~~ISSO / AO / System Owner: Chris Tonjes (with role-concentration risk acceptance)~~ ✓ 5. ~~Stack: Python 3.12 / FastAPI / SQLAlchemy / Postgres (OWC alignment)~~ ✓ 6. ~~Draft the PIA — minors + FERPA + CFSA is the substantive part~~ ✓ (v0.1 drafted 2026-09-30) 7. Get **existing OSSE, CFSA, and SSA agreements pulled from OGC files** to scope renewals (`YPMS-POAM-020`, `YPMS-POAM-021`, `YPMS-POAM-022`) 8. Draft the **FIPS 199 categorization memo** for AO signature (`YPMS-POAM-001`) 9. ~~Start the architecture document~~ ✓ (`ypms/ARCHITECTURE.md` v0.1 drafted 2026-09-30) 10. Route PIA v0.1 to Privacy Officer + OGC review 11. ~~Author PHASE0_PLAN.md~~ ✓ (`ypms/PHASE0_PLAN.md` v0.1 drafted 2026-09-30) 12. DC OCTO security architecture review meeting scheduled ## Parking lot (not yet triaged) - Emerging-tech (GenAI/ML) posture — ethical measures required; data must stay in DOES domain (`YPMS-POAM-103`) - FOIA response workflow with PII redaction (`YPMS-POAM-102`) - Records schedule alignment with DOES records officer - Approved-software list governance (`YPMS-POAM-100`) - Employer 360 dependency: once E360 lands, YPMS host/employer records should consume it rather than re-implementing employer matching