Pre-development state; no code yet. Delivery model: in-house build by DOES OIT on Azure Government, matching the DCYWP / OWC / Employer 360 pattern. Stack decision (2026-09-30): Python 3.12 / FastAPI / SQLAlchemy / Postgres, aligning with OWC. System Owner / ISSO / AO: Chris Tonjes (DOES CIO). Role concentration recorded in SSP §5 with risk-acceptance rationale. Source functional and security requirements derived from the prior YPMS RFP (Solicitation Docxxxxx, April 2025) — 54 C.5.7 security requirements and Appendix E non-functional requirements — treated as source specifications, not as Contractor obligations. Documents included: - CLAUDE.md, OVERVIEW.md — project router and program-level summary - SYSTEM_SECURITY_PLAN.md v0.3 — NIST 800-53 Moderate baseline SSP - NIST_800_53_CONTROL_MAPPING.md v0.2 — full control-family mapping with in-house ownership tags and evidence-artifact expectations - POAM.md v0.1 — 62-item POA&M seeded from tailorings, open decisions, missing companion docs, and pre-ATO deliverables; two items closed - PRIVACY_IMPACT_ASSESSMENT.md v0.1 — full PIA covering minors, SSN, banking, FERPA-covered OSSE records, CFSA foster/ward flags, and the dormant emergency health-record path - ARCHITECTURE.md v0.1 — forward-looking design blueprint, OWC-aligned - PHASE0_PLAN.md v0.1 — framework vendor-in, auth, RBAC, audit, Registrant vertical slice, 501 stubs for remaining entities - TODO.md — 12-section working checklist tied to POA&M IDs - OLA_RESPONSE_2026-09-30.md — Q&A for OLA / City Administrator Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
11 KiB
11 KiB
YPMS — TODO Checklist
Owner: DOES CIO
Last touched: 2026-09-30
Scope: everything from team formation through Go-Live and steady-state operations. Companion tracker: POAM.md holds the numbered, dated, milestone-tracked version of the ATO items below.
Legend: [ ] open · [~] in progress · [x] done · [!] blocked · [?] needs decision
0. Team formation and governance
- ISSO assigned in writing for YPMS (Chris Tonjes;
YPMS-POAM-090closed 2026-09-30) - AO designated in writing (Chris Tonjes;
YPMS-POAM-002closed 2026-09-30; role-concentration acceptance in SSP §5) - Business Owner named (OYP)
- DOES OIT delivery lead named
- Backend engineer(s) assigned
- Frontend engineer(s) assigned
- Data/integration engineer assigned (owns OSSE, CFSA, SSA, DC MAR, payroll)
- Test/QA lead assigned
- DC OCTO cloud coordination POC identified
1. Stack and architecture decisions
- Stack decision — Python 3.12 / FastAPI / SQLAlchemy / Postgres (OWC alignment; recorded 2026-09-30)
- Azure Government confirmed as hosting (aligned with OWC and Employer 360)
- [?] Level 3 security clarification — source RFP
C.5.7.24(YPMS-POAM-051) - [?] Youth identity model — social-media login scope, IAL2-equivalent proofing before payroll actions, parental co-auth for under-18 (
YPMS-POAM-050) - [?] PCI DSS applicability — expected out of scope since payroll is ACH via vendor (
YPMS-POAM-052) - [?] Health-record CSV path disposition — in-boundary vs. emergency extension (
YPMS-POAM-053) - [?] Retention policy — audit logs, case records, backups (
YPMS-POAM-054) - SORN applicability determination (
YPMS-POAM-094) - Correct the youth-age typo from the source RFP (glossary says "99–24"; should be 14–24) in derived requirements
- High-level architecture document v0.1 drafted (
ypms/ARCHITECTURE.md, 2026-09-30) - Conceptual data model in
ARCHITECTURE.md§6 (25 core entities enumerated); logical + physical ERDs remain - Logical and physical ERDs, full data dictionary, CRUD matrix (extends
ARCHITECTURE.md§6) - Security architecture review with DC OCTO (referenced in
ARCHITECTURE.md§8)
2. Environments and pipeline
- Azure Government subscription requested and provisioned (
YPMS-POAM-041) - Dev environment
- Test environment
- Production environment (later)
- CIS Azure Foundations baseline applied to all environments
- Azure Key Vault (FIPS 140-3 HSM) provisioned (
YPMS-POAM-032) - Managed Identity model for service-to-service auth
- Postgres flexible server provisioned (private endpoint)
- Git repo initialized under
ypms/(this directory) with branch protection - CI/CD pipeline scaffold (
YPMS-POAM-042)- Build + unit-test gate
- SAST gate
- SCA (dependency vulnerability) gate
- Secret scanning gate
- SBOM generation per release (CycloneDX)
- Container image scanning
- Sentinel integration for log streaming (
YPMS-POAM-043) - Backup + restore procedure documented and tested (
YPMS-POAM-044)
3. Data-sharing agreements & interconnections
Existing DOES agreements cover the current OYP workflows; YPMS-scope amendments or renewals are the path, not new drafts.
- DOES–OSSE data-sharing agreement (FERPA) — renewal / YPMS-scope amendment (
YPMS-POAM-020) — blocks OSSE ingest build - DOES–CFSA MOU (DC Code Title 4) — renewal / YPMS-scope amendment (
YPMS-POAM-021) — blocks CFSA ingest build - SSA Electronic Information Exchange agreement — renewal / YPMS-scope confirmation (
YPMS-POAM-022) — blocks SSN cross-match build - DC MAR service agreement — confirm coverage under existing OCTO umbrella
- Payroll vendor selection + security review + ISA/DPA (
YPMS-POAM-023) — blocks payroll integration build - LMS vendor selection + security review — blocks orientation-tracking build
- DC OCTO Sentinel MOU / ingestion agreement
- NOC coordination arrangement — 30-day maintenance-window notice cadence
- Emergency health-record CSV path — either MOU with source or scoping decision to defer (
YPMS-POAM-053) - ISAs / NIST 800-47 Rev. 1 documents for each of the above (
YPMS-POAM-084)
4. ATO artifacts
- Draft SSP v0.3 (
ypms/SYSTEM_SECURITY_PLAN.md) — in-house build reframe complete (YPMS-POAM-010) - Draft NIST 800-53 control mapping v0.2 (
ypms/NIST_800_53_CONTROL_MAPPING.md) — in-house build reframe complete (YPMS-POAM-015) - Draft POA&M v0.1 (
ypms/POAM.md) — reflects in-house build model - FIPS 199 categorization memo signed by AO (
YPMS-POAM-001) - Privacy Impact Assessment v0.1 drafted (
YPMS-POAM-011;ypms/PRIVACY_IMPACT_ASSESSMENT.md; 2026-09-30) — awaiting Privacy Officer + OGC review, then AO signature - Incident Response Plan — tabletop with DC OCTO SOC (
YPMS-POAM-012) - Contingency Plan — functional restore drill (
YPMS-POAM-013) - Rules of Behavior — staff / host / youth+parent variants with parental-consent flow (
YPMS-POAM-014) - Continuous Monitoring Strategy document (
YPMS-POAM-074) - Independent Control Assessment (SCA) commissioned and executed (
YPMS-POAM-060) - Penetration test commissioned and executed (
YPMS-POAM-061) - ATO decision package compiled and submitted to AO
- ATO signed before production data flows in
5. Build
Iterative Agile delivery (Scrum/Kanban/SAFe — match OWC's phased approach). Illustrative phase breakdown; refine at architecture kickoff.
- Phase 1 — Foundation. Auth, user model, RBAC, base UI shell, admin skeleton, audit-logging framework.
- Phase 2 — Application intake. Youth registration, application form, save/resume, document upload with malware scanning.
- Phase 3 — Eligibility engine. Rules-driven auto-eligibility from Appendix D of source RFP; categorical eligibility across programs.
- Phase 4 — External integrations. DC MAR address verification, SSA SSN verify (blocked on
YPMS-POAM-022), OSSE ingest (blocked onYPMS-POAM-020), CFSA ingest (blocked onYPMS-POAM-021). - Phase 5 — Certification and orientation. Certification event workflow, LMS integration.
- Phase 6 — Host/employer. Host registration, worksite management, job posting.
- Phase 7 — Matching and enrollment. Job matching engine, program enrollment.
- Phase 8 — Time and payroll. Online timekeeping, payroll vendor integration (blocked on
YPMS-POAM-023), transportation vouchers, tax forms. - Phase 9 — Reporting. Native reports replacing MicroStrategy; audit-log search.
- Phase 10 — Admin functions. Broadcast notifications, workflow rule maintenance, user profile management.
6. Security implementation (crosscuts all phases)
- MFA for staff and admin (Entra ID conditional access) (
YPMS-POAM-030) - TLS 1.2+ enforced everywhere; SSL Labs A+ on public endpoints (
YPMS-POAM-031) - FIPS 140-3 cryptography (
YPMS-POAM-032) - IAL2-equivalent identity proofing before payroll actions (
YPMS-POAM-033) - SSN masking + at-rest encryption (
YPMS-POAM-080) - System-use notification banner (
YPMS-POAM-070) - Auto-disable inactive accounts (
YPMS-POAM-071) - Quarterly privileged-access recert process (
YPMS-POAM-072) - Annual all-user access recert process (
YPMS-POAM-073) - Language Access Act compliance (
YPMS-POAM-081) - Section 508 / WCAG 2.1 AA compliance audit (
YPMS-POAM-082) - Parental consent workflow for under-18 (
YPMS-POAM-083) - Anti-bot / rate-limit for MBSYEP peak windows (
YPMS-POAM-101)
7. Testing
- Unit-test coverage target set and enforced in CI
- Functional tests per feature
- Non-functional tests: performance (99.5% SLA envelope, <1s response), load (50%/year growth headroom)
- Accessibility tests (Section 508)
- Language-access tests
- UAT plan and test scripts approved
- Vulnerability scanning cadence in production (
YPMS-POAM-062)
8. Legacy retirement & data migration
- Data-migration plan from each of the seven legacy tools (
YPMS-POAM-105) - Data-quality baselines documented per source
- PII handling during migration
- Cutover strategy — big-bang vs. phased-by-program
- Read-only archive of legacy data for audit / statute-of-limitations retention
- Legacy system decommission schedule and destruction evidence (
YPMS-POAM-106)
9. Training & change management
- Training plan for OYP staff, host/employer, youth self-service (
YPMS-POAM-091) - System overview intro video (MP4, closed captioned)
- Role-based training materials
- Help / KB content with an updateable help system
10. Go-Live & steady-state
- Go/No-Go decision meeting with AO
- Cutover runbook rehearsed
- Go-Live
- Post-Go-Live retrospective
11. Continuous monitoring (steady-state cadence)
- Monthly vulnerability scans
- Monthly POA&M review by DOES ISSO
- Quarterly privileged access recertification
- Annual full access recertification
- Annual Contingency Plan test (tabletop + functional element)
- Annual Independent Control Assessment
- Annual penetration test
- Annual SSP refresh
- Monthly availability performance report against 99.5% SLA
Immediate next actions (this week)
SSP v0.3 in in-house build framing✓Control mapping v0.2 in in-house build framing✓POA&M v0.1 seeded✓ISSO / AO / System Owner: Chris Tonjes (with role-concentration risk acceptance)✓Stack: Python 3.12 / FastAPI / SQLAlchemy / Postgres (OWC alignment)✓Draft the PIA — minors + FERPA + CFSA is the substantive part✓ (v0.1 drafted 2026-09-30)- Get existing OSSE, CFSA, and SSA agreements pulled from OGC files to scope renewals (
YPMS-POAM-020,YPMS-POAM-021,YPMS-POAM-022) - Draft the FIPS 199 categorization memo for AO signature (
YPMS-POAM-001) Start the architecture document✓ (ypms/ARCHITECTURE.mdv0.1 drafted 2026-09-30)- Route PIA v0.1 to Privacy Officer + OGC review
Author PHASE0_PLAN.md✓ (ypms/PHASE0_PLAN.mdv0.1 drafted 2026-09-30)- DC OCTO security architecture review meeting scheduled
Parking lot (not yet triaged)
- Emerging-tech (GenAI/ML) posture — ethical measures required; data must stay in DOES domain (
YPMS-POAM-103) - FOIA response workflow with PII redaction (
YPMS-POAM-102) - Records schedule alignment with DOES records officer
- Approved-software list governance (
YPMS-POAM-100) - Employer 360 dependency: once E360 lands, YPMS host/employer records should consume it rather than re-implementing employer matching