7 Commits
Author SHA1 Message Date
Chris TonjesandClaude Opus 5.5 e3c4cb0cdc Phase 0 milestone 0.9: docs + acceptance
ci / test (push) Has been cancelled
- README rewritten: Docker and native quickstarts, try-it flow, gate
  commands, promote-a-stub steps.
- CONTRIBUTING rules 9-13 (pii_read on PII reads, __audit_redact__ for
  encrypted columns, retention policy per table, models.py registry,
  vendored-code change discipline); PR checklist updated.
- docs/nist-mapping.md: per-control file:line evidence and remaining gap.
- NIST_800_53_CONTROL_MAPPING.md v0.3: Phase 0 notes on 28 rows
  (12 implemented, 12 partial, 4 progress notes on hybrid/tailored rows)
  plus a status-shift table.
- PHASE0_PLAN: 0.9 complete; Definition of Done 12/14 checked with how
  each was verified. Open: first green Gitea CI run, Docker/Postgres boot.
- POA&M and status handoff updated; status TL;DR no longer claims an
  unverified Docker boot.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-01 14:37:40 -04:00
Chris TonjesandClaude Opus 5.5 170280ed38 Record milestone 0.8 status: pipeline complete, green-on-main pending Gitea runner
ci / test (push) Has been cancelled
PHASE0_PLAN 0.8 marked in progress with the remaining exit check;
ARCHITECTURE 9.3 and the plan's CI-provider question resolved to Gitea
Actions; YPMS-POAM-042 to in progress; status handoff gets 0.8 details,
runner-registration steps, local gate commands, and the accumulated
upstream-to-OWC list.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-01 10:57:53 -04:00
Chris TonjesandClaude Opus 5.5 20a7fdf262 Mark milestone 0.7 complete in PHASE0_PLAN, POA&M, and status handoff
ci / test (push) Has been cancelled
Status handoff also records the 0002 unique-constraint drift follow-up
and the CI-host question (Gitea vs. GitHub Actions) blocking 0.8.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-01 09:42:44 -04:00
Chris TonjesandClaude Opus 5.5 7d11f2404f Mark milestone 0.6 complete in PHASE0_PLAN, POA&M, and status handoff
ci / test (push) Has been cancelled
Status handoff also records four permission-matrix review items the
stub sweep surfaced (no Restore holders; admin-only Program /
EligibilityRule config; admin-only IntegrationEvent; HOST_USER Delete
pending row-level ownership).

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-09-30 20:54:51 -04:00
Chris TonjesandClaude Opus 5.5 e5720440fb PHASE0_STATUS: remote is HTTPS, not SSH
ci / test (push) Has been cancelled
Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-09-30 19:26:40 -04:00
Chris TonjesandClaude Opus 5.5 6b2d0008a1 Mark milestone 0.5 complete in PHASE0_PLAN, POA&M, and status handoff
ci / test (push) Has been cancelled
PHASE0_STATUS also refreshed: SSH remote, push state, 0.6 as next
milestone, new gotchas (write-only SSN, __audit_redact__, key changes).

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-09-30 19:26:34 -04:00
Chris TonjesandClaude Opus 4.7 185b5d2af3 Add PHASE0_STATUS.md — handoff doc
ci / test (push) Has been cancelled
Snapshot of where Phase 0 stands after milestones 0.1-0.4. Structured
as: TL;DR, current state, what's done per milestone, what's next, locked
decisions, open questions, repo state, how to run + verify, gotchas,
file map, POA&M state. Mirrors the DCYWP PHASE_2_STATUS pattern so
anyone (or a future session) can pick this up cold.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-09-30 19:15:20 -04:00