Commit Graph
2 Commits
Author SHA1 Message Date
Chris TonjesandClaude Opus 5.5 e3c4cb0cdc Phase 0 milestone 0.9: docs + acceptance
ci / test (push) Has been cancelled
- README rewritten: Docker and native quickstarts, try-it flow, gate
  commands, promote-a-stub steps.
- CONTRIBUTING rules 9-13 (pii_read on PII reads, __audit_redact__ for
  encrypted columns, retention policy per table, models.py registry,
  vendored-code change discipline); PR checklist updated.
- docs/nist-mapping.md: per-control file:line evidence and remaining gap.
- NIST_800_53_CONTROL_MAPPING.md v0.3: Phase 0 notes on 28 rows
  (12 implemented, 12 partial, 4 progress notes on hybrid/tailored rows)
  plus a status-shift table.
- PHASE0_PLAN: 0.9 complete; Definition of Done 12/14 checked with how
  each was verified. Open: first green Gitea CI run, Docker/Postgres boot.
- POA&M and status handoff updated; status TL;DR no longer claims an
  unverified Docker boot.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-01 14:37:40 -04:00
Chris TonjesandClaude Opus 4.7 8712e93258 Initial YPMS planning and ATO artifacts
Pre-development state; no code yet.

Delivery model: in-house build by DOES OIT on Azure Government,
matching the DCYWP / OWC / Employer 360 pattern.

Stack decision (2026-09-30): Python 3.12 / FastAPI / SQLAlchemy /
Postgres, aligning with OWC.

System Owner / ISSO / AO: Chris Tonjes (DOES CIO). Role concentration
recorded in SSP §5 with risk-acceptance rationale.

Source functional and security requirements derived from the prior
YPMS RFP (Solicitation Docxxxxx, April 2025) — 54 C.5.7 security
requirements and Appendix E non-functional requirements — treated as
source specifications, not as Contractor obligations.

Documents included:

- CLAUDE.md, OVERVIEW.md — project router and program-level summary
- SYSTEM_SECURITY_PLAN.md v0.3 — NIST 800-53 Moderate baseline SSP
- NIST_800_53_CONTROL_MAPPING.md v0.2 — full control-family mapping
  with in-house ownership tags and evidence-artifact expectations
- POAM.md v0.1 — 62-item POA&M seeded from tailorings, open decisions,
  missing companion docs, and pre-ATO deliverables; two items closed
- PRIVACY_IMPACT_ASSESSMENT.md v0.1 — full PIA covering minors, SSN,
  banking, FERPA-covered OSSE records, CFSA foster/ward flags, and
  the dormant emergency health-record path
- ARCHITECTURE.md v0.1 — forward-looking design blueprint, OWC-aligned
- PHASE0_PLAN.md v0.1 — framework vendor-in, auth, RBAC, audit,
  Registrant vertical slice, 501 stubs for remaining entities
- TODO.md — 12-section working checklist tied to POA&M IDs
- OLA_RESPONSE_2026-09-30.md — Q&A for OLA / City Administrator

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-09-30 12:14:24 -04:00