Commit Graph
1 Commits
Author SHA1 Message Date
Chris TonjesandClaude Opus 5.5 e3c4cb0cdc Phase 0 milestone 0.9: docs + acceptance
ci / test (push) Has been cancelled
- README rewritten: Docker and native quickstarts, try-it flow, gate
  commands, promote-a-stub steps.
- CONTRIBUTING rules 9-13 (pii_read on PII reads, __audit_redact__ for
  encrypted columns, retention policy per table, models.py registry,
  vendored-code change discipline); PR checklist updated.
- docs/nist-mapping.md: per-control file:line evidence and remaining gap.
- NIST_800_53_CONTROL_MAPPING.md v0.3: Phase 0 notes on 28 rows
  (12 implemented, 12 partial, 4 progress notes on hybrid/tailored rows)
  plus a status-shift table.
- PHASE0_PLAN: 0.9 complete; Definition of Done 12/14 checked with how
  each was verified. Open: first green Gitea CI run, Docker/Postgres boot.
- POA&M and status handoff updated; status TL;DR no longer claims an
  unverified Docker boot.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-01 14:37:40 -04:00